OFFER

INVESTOR:

  • consultation, conducting feasibility studies , pre-design, schematic design, design development, construction documentation, bidding and contract negotiation, construction administration
  • specialist studies such as construction expertise, geotechnical studies, water and legal surveys, conservation studies
  • coordinating project with engineers, contractors
  • as-built drawings
  • obtaining building permits and variances from the city

DEVELOPER:

  • conducting feasibility studies
  • preparation of applications and obtaining building permits
  • analysis of the Local Development Plan and creating studies with few design solutions
  • obtaining development requirements from the city

CONTRACTOR:

  • coordination of the project, review of the final construction set. Efficiency study with quality control. Verification in BIM technology any possible improvements and revisions
  • creating project schedule
  • coordinating cost and possible value engineer options using BIM technology
  • construction administration
  • Inspect the building during a final walk-through to ensure that the building is complete enough to be occupied, and follow-up with contactor to address any remaining deficiencies